- +97148767644
- contact@pfc-group.co
Al Taweelah, Abu Dhabi
Supply & Apply Road Markings on the asphalt road in a Power Steam Plant
Abu Dhabi, UAE
Perfection Frontier Contracting LLC
PFC’s scope of work was to supply & apply road markings on the asphalt road in a Power Steam Plant which required for the Al Taweelah Power and Steam Integration Project at the Smelter site in Al Taweelah, Abu Dhabi.
PFC executed the construction of gravel access infrastructure to the water treatment plan, fuel gas area and new substation from the existing tie in point, including all earthworks road kerbing, signage, marking and furniture as well as any preparation works required at the infrastructure tie in. Infrastructure was to be designed and constructed in accordance with Granular pavement specification meeting the subgrade requirements to receive bitumen coating in the future.
PFC’s workforce is continuously trained to the highest industry standards for Road and Car Park Line Marking. Supervisors and Managers are all assessed in addition to their required technical qualification.