DUBAL Cast House
2021
DUBAL using industrial heavy duty structures to store the materials, Dross Bunker area was upgraded by demolishing the existing damaged slab, prepare surface, supply and cast the concrete with steel tables in new storage Dross Bunker area in order to facilitate the safe operations for dross dumping.
PFC was hired for demolishing the existing damaged slab and prepare surface and to fix it.
This was a difficult job, with the building phase occurring concurrently with the oven’s refractory relief and in a live castle with little interruption to the customer’s adjacent furnaces’ output. To ensure that the customer meets its year-end objectives, stringent deadlines must be met.