Main Consultant

DUBAL engineering

Main Contractor

Perfection Frontier Contracting LLC

Location

UAE - Dubai

Client

Jabal Ali Water Filling Station

Year

2019

Jebel Ali Water Filling Station Structural Rehabilitation

Jabal Ali water filling station supplies 1.5% of Dubai’s water demand, as well as supplying other customers and meeting their own water needs. The station is 20 years  old paved with concrete slabs. These existing slabs has been settled at many location which was needed to be repaired. All major cracked area was needed to cut, cleaned & repair heavy duty water resistant repair products.

 

The project was executed under many challenges starting from Live Traffic Movement in the Area, Round the clock Operations, Demolition work near to operations, protection Underground services and implement all Covid 19 pandemic requirements. Even though all challenges, PFC managed to hand over the project on time and within client satisfaction.

 

.

Global Leadership of PFC Group

OUR CLIENTILE